向牛哥 (及NG级的大虾们) 请教 --- 近日混进一公司 as Team Lead. 老板让我评价他们的I.T. project document 体系。公司follow SDLC. 在下的问题是 [#3969827@0 -ROLIA.NET 相约加拿大网上社区 之 枫下论坛 & 枫下部落, 枫下论坛主坛 ]
向牛哥 (及NG级的大虾们) 请教 --- 近日混进一公司 as Team Lead. 老板让我评价他们的I.T. project document 体系。公司follow SDLC. 在下的问题是
by
james05
(重上井冈山)
at
2007.10.3 14:14
(#3969827@0)
在你的公司里,Requirement doc 通常包含 system level 的内容吗 –
Hardware Requirements,
Software Requirements ( including Client and Server),
Hosting Requirements,
Design Constraint,
Applicable Standards
Legal, Copyright etc,
请注意, Business User must sign off the Requirement doc.
How a BA can be good at the above? Should these be responsibilities of an Architect / Technical Lead? Should there be two documents - one being Business Requirements prepared by BA(s) to be signed off by the Business users and one being the technical design document prepared by Architect / TL which does not need the Business' sign-off?